Automatic Producing Line for Refrigerator Compressor Copper Welding
Dimension
Welding machine parameter
Rated capacity |
440KVA*5 sets; 660*1 set |
Power supply |
380V/ 50Hz / 3 Phase |
Primary current |
350A; 500A |
Rated duty cycle |
20% |
Secondary empty voltage |
10.4V |
Max working pressure |
1500kgf, 2500kgf |
Max short circuit current |
60KA, 85KA |
Welding speed |
7s/pc |
Welding stroke |
150mm |
Heron own over 56,000 square meters property; developed MFDC welding system, Capacitor discharge welding system, three-phase DC welding system; single phase AC welding system; offer a complete range of standard resistance welding equipments; and customize automation resistance welding production system with fixture; pursue high welding technology researching and developing all the time.
Company Brief
Founded in 1997.
Registered capital is 48 million RMB , about 350 employees and around 30,000 m2 property.
R&D on a wide range of Resistance Welding Machines and Production Lines.
Continuous Innovation.
Green Manufacturing.
With ISO9001, CCC, CE certification.
Products applying to----
Automobile and Auto Parts Manufacturing Industry,
Motor and Generator Manufacturer Industry,
Low-Voltage Electrical Industry,
Compressor Manufacturing Industry,
Home Appliance and Hardware Industry,
BTM Tog-L-Loc system and so on..
Why choose us?
1. Foundation: Founded in 1997.
2. Company Scale: Registered capital: 48.5765 million RMB, about 400 employees.
3. Business Scope: Professional manufactures whole series of resistance welding machines and completed metal connection intelligent equipment.
4. Enterprise Features: Continuous Innovation
5. Management Philosophy: People-oriented; Green manufacturing.
6. Certification: ISO9001, CCC, CE certification.
7. Application Industries: Automobile and auto parts, motor and generator, low-voltage electrical industry, compressor, household appliance and hardware Industry, BTM-L-Loc system and so on.
FAQ
1.What's the trade terms?
A: FOB, EX-Work, CRF
2.What's the payment term?
A: a. T/T 30% as deposit, 70% should be paid before delivery.
b. L/C at sight
3. What's the delivery time?
A: 2-3 months after received 30% deposit.
4. What's the package way?
A: Wooden case
5. Which shipment port?
A: Guangzhou or Huangpu
6.How long is the guarantee?
A: For one year after customer received the machine. (It's not including the comsumables)